Guangzhou Metro Line 13

Line 13 of the Guangzhou Metro is a rapid transit rail line currently in operation as of 28 December 2017 in Guangzhou, China. It is envisioned to be the “East West express line” complimenting Line 3 which is the “North South express line”. The line serves some of the most popular areas in Guangzhou such as Luochongwai Bus Terminal, Zhujiang New Town CBD and Yuancun while passing through some of the densest and most populated areas of Tianhe, Yuexiu, and Liwan Districts. Due to the density of the areas served, demand for this line is expected to be high, with average daily ridership predicted at 1.44 million passengers per day when both phases are complete. Knowing this engineers designed the line to use 8 car wide body A size rolling stock, the highest capacity rolling stock in the Guangzhou Metro to date. To fulfill its role as a crosstown express service, the line is designed with a service speed of 100 km/h (62 mph) with a wider stop spacing. The first phase runs from Yuzhu in Huangpu to Xinsha in Zengcheng, opened on 28 December 2017 and is expected to initially serve 220,000 riders per day. The first section of Phase 2 between Yuzhu to Tianhe Park is preparing for construction.

Guangzhou Metro Line 13 Timetable 

Service Time
Direction
First Train
Last Train
Number Station to Yuzhu to Xinsha to Yuzhu to Xinsha
13 | 01
Yuzhu 6:15 22:50
13 | 02
Yufengwei 6:14 6:18 22:58 22:53
13 | 03
Shuanggang 6:11 6:20 22:55 22:55
13 | 04
Nanhai God Temple 6:08 6:24 22:52 22:59
13 | 05
Xiayuan 6:19 6:08 22:49 23:02
13 | 06
Nangang 6:16 6:10 22:46 23:05
13 | 07
Shacun 6:11 6:14 22:41 23:09
13 | 08
Baijiang 6:08 6:18 22:38 23:13
13 | 09
Xintang 6:05 6:21 22:35 23:16
13 | 10
Guanhu 6:01 6:10 22:31 23:19
13 | 11
Xinsha 6:00 22:30

Check Also

Guangzhou Metro Line 9 Timetable

Guangzhou Metro Line 9  Timetable Line 1 ,    Line 2 ,   Line 3 ,   Line …

Leave a Reply

Your email address will not be published. Required fields are marked *